News

Weiter mit Alb - Traum - Haus oder endlich ein Traum - Haus und noch etwas Geld zum Leben übrig?
Disruptive Change in the Construction Industry – Use of Robots in Construction
How can standardization foster the impact of Horizon Europe projects?
Keynote at Design Computing Conference 2018 in Prague: "Robot Oriented Design Computing"
Chairholder keynote for Korean Ministry of Health and Welfare
Transformer Architecture Summer Workshop Japan
DFG Seibold Lecture in KyuTec
Modular Building Institute USA holds its European Council Meeting at TUM br2
REbuild 2017 | Intervista a Thomas Bock - Baurealisierung und Baurobotik TU Munich
Mr. Ituralde presented the EU BERTIM Project at ISARC 2018 in Berlin.
Dr Bahriye Ilhan presented EU Project ZERO-PLUS in Japan
Chairholder delivers Keynote on Strategic Research Programme for Robotics at Cities of Tommorrow Summit Singapore
Mr Wen Pan and Mr Rongbo Hu presented their scientific papers at the Creative Construction Conference (CCC) 2018 in Ljubljana, Slovenia
br2 Organizes 2 Missions from Hongkong Science and Technology Park and Construction Industry Council to Europe(Finland and Germany) on Automation and Robotics in Infrastructure and Modular Industrialized Building for Affordable Housing
Chair facilitates start-up creation in the field of construction robotics
Chairholder invited to university hospital geneva to talk on: The Robotic Future of Elderly Care
New CIB Proceedings W119-TG93: International Conference on Smart, Sustainable and Sensuous Settlements Transformation (3SSettlements)
The chair’s BMBF project on „assistive workplaces” covered in ZDF’s TV documentation series “plan b”
11th World Conference on Gerontechnology
Prof. Inaba of University of Tokyo gives a Talk on humanoid robotics at br2

 

Teleconstruction Site


picture_1
picture_2
picture_3
picture_4

Tele-Construction Experimenting Site is an experimenting site located at Garching Campus, used for multiple purposes. This real site related approach enables technologies and sub-components that are embedded in the final products of those sub system or component manufacturing industries. Sometimes advanced industries are even able to transfer process technologies and management strategies between each other. The site is open for students and researchers to implement mock ups, experimental shelters/buildings, tele-construction experiments, distinguish and apply various demonstrator/prototype evaluation methods, use evaluation feedbacks for further development of the project in subsequent evaluation-development cycles.